优秀毕业设计整理版.doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
优秀毕业设计整理版.doc

上海市**公寓基坑支护设计与施工方案 摘要: 本工程是位于上海市的××公寓大楼,地上7层,地下1层,总建筑面积5247m2,建筑防火等级二级,抗震设防烈度7度。本次设计的项目主要分为对基坑工程相关研究领域的认识;基坑支护的设计以及编写本工程的基坑支护施工组织方案。根据场地地质条件及周边环境,经过对建筑基坑侧壁等级的确定以及基坑支护方案比选,北侧、东侧与西侧的支挡结构采用排桩+截水帷幕+土层锚杆,南侧的支挡结构采用放坡+土钉墙+截水帷幕。同时经过对挡土结构的稳定性分析,对土层锚杆的稳定性的分析,以及对土钉墙采用圆弧滑动条分法进行的稳定性验算,这些手工计算结果需满足现行国家规范、规程和标准要求。 关键词: 支挡结构 排桩 截水帷幕 土层锚杆 土钉墙 The Apartment building of XingYang reach on the city of shanghai excavate for building foundation and desin the literature summary Weixing The city construction college,Nanhua University,Hengyang,421001,Hunan,China Tutor:Xiongzhibiao Abstract: This graduation project,reach on the city of shanghai,called Apartment building of XingYang. The construction is divided into five ground and one Underground. total Construction area 5247m2invariablyThis building fireproof rank two grades , anti-seismic capability fortifyying earthquake intensity 7 degrees. This design project mainly divides into the hole excavated for building foundation project correlation research area understanding;Design the system of retaining and protecting for foundation excavation. as well as to arrange the comp book project of retaining and protecting for foundation excavation organization plan. According to the location geological condition and surrounding around foundation pit, and pass through to determine the safty class of side of foundation pit as well as slect the plan of the retaining and protecting for foundation excavation. The north side, the east side and the west side retainging structure to use the piles in row + curtain for cutting off water + soil anchor, and the south side retainging structure to use puts the slope + soil nailing wall + curtain for cutting off water. Simultaneously passes through to the retaining structure of soil of the stability analysis; and to the soil anchor of the stability analysis; as well as to adopt the stable checking calculation to the soil nailing wall with the circular arc glide Swedish method, These manual comp

文档评论(0)

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档