1.QACGPTPlastering(EnglishandChinese)精要.pptVIP

  • 9
  • 0
  • 约2.69万字
  • 约 73页
  • 2016-12-24 发布于湖北
  • 举报
Inspection Testing Execution- Basecoat Application. Comb the surface before the basecoat hardens to provide key for the subsequent coat. Procedure 基底涂层 在底层涂料变干之前将墙面梳理成波纹状 Inspection Testing Execution- Basecoat Application. Indicate the date of application on plaster wall for monitoring of curing time. Procedure 基底涂层 为了监控养护时间,在墙面标注出完成当天的日期 Inspection Testing Execution- Basecoat Curing. Curing for minimum 7 days time must be allowed for basecoat before applying the final coat. Procedure 基底涂层的养护 在粉刷最后粉灰层前先将基底涂层养护至少7天 Inspection Testing Execution- Final Coat Application Wash basecoat