变电站综合自动化系统.doc

  1. 1、本文档共74页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
摘要 变电站综合自动化系统自20世纪90年代以来,一直是我国电力行业中的热点之一。它既是电力建设的需要也是市场的需要,我国每年变电站的数量以3%~5%的速度增长,每年有千百座新建变电站投入运行;同时根据电网的要求,每年又有不少变电站进行技术改造,以提高自动化水平。近几年来我国变电站综合自动化技术,无论从国外引进的,还是国内自行开发研制的系统,在技术和数量上都有显著的发展。本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势,从负荷增长方面阐明了建站的必要性然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV,35kV,10kV以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,从而完成了110kV变电站的设计。 关键词:变电站 ; 变压器 ; 主接线 Abstract Integrated substation automation system since 1990's, Chinese power industry has been one of the hotspots. It is also the needs of the construction of electricity market demand, China in year of substation quantity rate of 3% ~ 5% a year, throuands of newly-constructed substations is put into operation, According to requirements of electric substation, and there are many technical renovation, in order to improve the level of automation. In recent years, our integrated substation automation technology introduced from abroad, regardless of the domestic devolope, or in the system, technology and quantity are significant development. Firstly, according to the task given system and line book all the parameters, and the load from the analysis of load development trend, load increasing illustrates the necessity of the establishment of substations built by the generalization and outlet to consider, and through the analysis of the data of load, safety, economy and reliability into consideration, determine the 110 kv and consumers 10kV power station, as well as 35kV main connection, and then through the load calculation and power supply range determines the main transformer capacity and models, and also identified with the capacity of transformer station, finally, according to the model and maximum sustained working current and short circuit calculation results of high-pressure fuse, isolating switch, bus, insulator and wear casing wall, voltage transformer, the selection of current transformer substation, a

文档评论(0)

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档