- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
16.1 Transmission and Distribution Systems1) Are comprised of three-phase AC systems operating essentially at constant voltage. Generation and transmission facilities use three-phase equipment. Industrial loads are invariably three-phase. Single-phase residential and commercial loads are distributed equally among the phases so as to effectively form a balanced three-phase system.2) Use synchronous machines for generation of electricity. Prime movers convert the primary sources of energy (fossil, nuclear, and hydraulic) to mechanical energy that is, in turn, converted to electrical energy by synchronous generators.3) Transmit power over significant distances to consumers spread over a wide area. This requires a transmission system comprising subsystems operating at different voltage levels.Fig.16-1 One-line diagram16.2 Power System ControlsFig.16-2 Voltage regulator and turbine-governor controls for a steam-turbine generator16.2 Power System ControlsFig.16-3 Daily load cycle16.3 Generator-Voltage ControlFig.16-4 Simplified block diagram—generator-voltage control16.4 Turbine-Governor ControlFig.16-5 Steady-state frequency-power relation for a turbine-governor16.4 Turbine-Governor ControlFig.16-6 Turbine-governor block diagram16.5 Load-Frequency Control1) Following a load change, each area should assist in returning the steady-state frequency error Δf to zero.2) Each area should maintain the net tie-line power flow out of the area at its scheduled value, in order for the area to absorb its own load changes.16.6 Optimal Power FlowThe economic dispatch problem is that how the real power output of each controlled generating unit in an area is selected to meet a given load and to minimize the total operating costs in the area. Economic dispatch has one significant shortcoming—it ignores the limits imposed by the devices in the transmission system. Each transmission line and transformer has a limit on the amount of power that can be transmitted through it, with the limits a
您可能关注的文档
- 电气防火技术 教学课件 作者 高庆敏 第3章.ppt
- 电气防火技术 教学课件 作者 高庆敏 第5章(1).ppt
- 电气防火技术 教学课件 作者 高庆敏 第7章(2).ppt
- 电气防火技术 教学课件 作者 高庆敏 第8章_接地_接零安全与防火.ppt
- 电气防火技术 教学课件 作者 高庆敏 第11章_静电危害及其防护.ppt
- 电气防火技术 教学课件 作者 高庆敏 第九章.ppt
- 电气防火技术 教学课件 作者 高庆敏 第六章.ppt
- 电气防火技术 教学课件 作者 高庆敏 第十章 (1).ppt
- 电气防火技术 教学课件 作者 高庆敏 第四章.ppt
- 电气防火技术 教学课件 作者 高庆敏 封面.ppt
- 电气工程与自动化专业英语 教学课件 作者 王伟 17.pptx
- 电气工程与自动化专业英语 教学课件 作者 王伟 18.pptx
- 电气工程与自动化专业英语 教学课件 作者 王伟 19.pptx
- 电气工程与自动化专业英语 教学课件 作者 王伟 20.pptx
- 电气工程与自动化专业英语 教学课件 作者 王伟 目录.pptx
- 电气工程与自动化专业英语 教学课件 作者 王伟v Chapter01电子课件.ppt
- 电气工程与自动化专业英语 教学课件 作者 王伟v Chapter02电子课件.ppt
- 电气工程与自动化专业英语 教学课件 作者 王伟v Chapter03电子课件.ppt
- 电气工程与自动化专业英语 教学课件 作者 王伟v Chapter04电子课件.ppt
- 电气工程与自动化专业英语 教学课件 作者 王伟v Chapter05电子课件.ppt
原创力文档


文档评论(0)