2016北京丰台区高考英语完形填空和阅理阅理选练及答案12.docVIP

  • 6
  • 0
  • 约1.21万字
  • 约 8页
  • 2015-12-28 发布于广东
  • 举报

2016北京丰台区高考英语完形填空和阅理阅理选练及答案12.doc

2016北京丰台区高考英语完形填空和阅理阅理选练及答案12.doc

阅读下列四篇短文,从每小题后所给的A,B,C或D四个选项中,选出最佳选项。 According to the US government, wind farms off the Pacific coast could produce 900 gigawatts of electricity every year. Unfortunately, the water there is far too deep for even the tallest windmills (see picture) to touch bottom. An experiment under way off the coast of Norway, however, could help put them anywhere. The project, called Hywind, is the world’s first large-scale deepwater wind turbine (涡轮发电机). Although it uses a fairly standard 152-ton, 2. 3-megawatt turbine, Hywind represents totally new technology. The turbine will be fixed 213 feet above t

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档