SAPMM模块介绍资料.ppt

  1. 1、本文档共47页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
This is a standard view of the procure to pay process and the most common. It may vary significantly based upon the company procedures, the products/services purchases and other factors. SAP allow businesses to tailor it to their needs. Starts with a requisition or need that needs to be filled. This can come from Planning (MRP), manually or other The purchase order is the document to fill the need: usually includes the vendor, cost/price, quantity, terms and other pertinent information. [ part one of the 3-way match] Notifying the vendor The goods are shipped and brought to the organization The goods are received (typically at the dock) and then put away [ part two of the three way match] An invoice is received from the vendor [third part of the 3-way match] After the tolerances/verification of the 3-way match are met a payment is made according to the terms agreed to on the purchase order. Requisitions can be created indirectly in the following ways: Via materials planning and control The component Consumption-Based Planning suggests materials that need to be ordered on the basis of past consumption or usage figures and existing stock levels. The order quantity and the delivery date are determined automatically. Via networks (from the component PS Project System) Requisitions are generated automatically from networks if: A material component with non-stock material or an external service component has been assigned to an operation and the indicator allowing automatic generation of requisitions immediately the network is saved has been set in the network. Via maintenance orders Requisitions are generated automatically from maintenance orders if: A material component with non-stock material has been assigned to an operation, or An operation with the control key for external services has been created. For further information, refer to the section Planning of an Order in the PM Maintenance Orders documentation. Via production orders (from the component PP Product

文档评论(0)

基本资料 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档