- 5
- 0
- 约 5页
- 2017-05-13 发布于贵州
- 举报
Coordinat departments
Coordinate departments: suburban highway management departments. Coordination of content: the confirmed information of the bridge bearing capacity;
Organization check actual bridge in good condition; After eliminate the necessity of new Bridges, the bridge reinforcement scheme is put forward, and both sides of the confirmation; Clear the date of transformer body through bridge; Transformer body through the bridge if damaged, after considering compensation matters.
5. The transformer secondary water cooling system needs to continue installation in construction site, construction units should
您可能关注的文档
- Big Bang—YG Entertainment的男子组合营销分析.doc
- binder低温培箱和热电生化培养箱价格.docx
- Biofuels rom microalgae—A review of technologies for production, processing, and extractions of bi.doc
- bj-rnbzv复大学保持共产党员先进性.doc
- BitWise控制统会议室方案设计 v1.docx
- BKW-Q01-0-0电动单梁、悬挂起重机安全技术性.doc
- BJ-TK15岩芯土取样钻机,浅层取样钻机.doc
- BIM技术,助力仁滨海中心项目精细化管理.docx
- Bmhyvrm复旦学保持共产党员先进性.doc
- BMZD-001工报告管理制度0311.doc
原创力文档

文档评论(0)