- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大学自我鉴定1500字
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 大学生预备党员转正申请书2000字模板.doc
- 大学生预备党员转正申请书2500字格式.doc
- 大学生预备党员转正申请书3000字范文.doc
- 大学生预备党员转正申请书600字.doc
- 大学生预备党员转正申请书优秀版.doc
- 大学生预备党员转正申请书优秀范文.doc
- 大学生预备党员转正申请书样本.doc
- 大学生预备党员转正申请书范文2013年9月.doc
- 大学生预备党员转正申请书范文2500字.doc
- 大学生预备党员转正申请书范文_0.doc
- 小学科学:ESP8266智能插座电路原理与动手实践研究教学研究课题报告.docx
- 《金融开放浪潮下我国多层次监管体系构建与创新研究》教学研究课题报告.docx
- 区域教育质量监测中人工智能应用的数据质量分析与优化策略教学研究课题报告.docx
- 《金融科技监管中的数据治理与合规性要求》教学研究课题报告.docx
- 《3D打印技术在航空航天领域中的多材料制造与复合材料应用》教学研究课题报告.docx
- 《绿色金融发展中的政府职能与市场机制研究》教学研究课题报告.docx
- 《植物工厂多层立体栽培光环境调控技术对植物生长发育节律的调控机制探讨》教学研究课题报告.docx
- 销售团队年度业绩总结.docx
- 银行风险管理与金融危机防范.docx
- 银行网络攻击预警与快速响应机制.docx
最近下载
- 最新完整版-途观2012版使用维护说明书.pdf
- 运动生理学 课后答案 (王瑞元 苏全生).pdf VIP
- 2025中国南水北调集团新能源投资有限公司第一批中层及职员岗位社会招聘模拟试卷含答案解析.docx VIP
- 2024年辽宁省高考英语试卷(含答案解析)+听力音频.docx
- 钢轨闪光焊工艺及缺陷 的分析.pdf VIP
- 农行支行信贷营销经验总结.pptx
- 电子制图Portel DXP 2004 项目三.pptx VIP
- 化工导论第三章资料.ppt VIP
- 电子制图Portel DXP 2004 项目二.pptx VIP
- (高清版)B 4053.2-2009 固定式钢梯及平台安全要求 第2部分:钢斜梯.pdf VIP
文档评论(0)