- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
学习三中全会精神思想报告:关注最热点
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 委托培训合同范文.doc
- 委托居间中介代理出售物业合同.doc
- 委托居间中介代理出售物业合同:租赁合同范本.doc
- 委托担保合同范文:借款合同范本.doc
- 委托接送服务合同样本.doc
- 委托收购合同范文.doc
- 委托放款协议范本.doc
- 委托检验协议书范本.doc
- 委托检验合同.doc
- 委托经营书模板.doc
- 2025年曾都区公开招聘30名城市社区专职工作者笔试备考试题及答案解析.docx
- 2025渭南富平泽明眼科医院招聘(12人)笔试模拟试题及答案解析.docx
- 2025河北唐山市丰润区招聘事业编制人员446人笔试模拟试题及答案解析.docx
- 2025新疆博乐市高校毕业生“三支一扶”计划招募32人笔试模拟试题及答案解析.docx
- 2025云南昭通市志愿服务联合会招聘城镇公益性岗位工作人员4人笔试模拟试题及答案解析.docx
- 2025四川九洲电器股份有限公司招聘财务管理岗等2人笔试模拟试题及答案解析.docx
- 2025四川雅安市天全县城区第一完全小学第二轮面向全县选聘教师5人笔试模拟试题及答案解析.docx
- 2025江苏镇江句容市后白镇选拔村级后备人才招聘9人笔试模拟试题及答案解析.docx
- 2025广西二七四地质队招聘4人笔试模拟试题及答案解析.docx
- 2025年巢湖黄麓师范学校编外聘用教师招聘11人笔试备考试题及答案解析.docx
文档评论(0)