21580中英文朗60362.doc

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
21580中英文朗60362

(四)锅炉本体受热面(组合)安装施工要求 (4) heating surface of boiler body (combination) installation requirements 1.锅炉受热面施工程序 1. The boiler heating surface construction procedures 锅炉受热面的施工程序为:设备及其部件清点检查→通球试验与清理→联箱找正划线→管子就位对口焊接→组件地面验收→组件吊装一组件高空对口焊接一组件整体找正等。 Construction procedures for boiler heating surface: equipment and parts inventory check to pass the ball test and clean up the to header to find are crossed, the pipe is in place in line welding - component ground acceptance - components hoisting a high-altitude counterpart welding a component of the overall alignment, etc. 2.锅炉受热面施工要求 2. The boiler heating surface construction requirements (3)锅炉受热面组件吊装原则和顺序 (3) boiler heating surface components hoisting principle and sequence 锅炉钢架施工验收合格后,即可进行锅炉受热面组件的吊装。 After the acceptance of boiler steel frame construction, boiler heating surface components hoisting can be achieved. 锅炉受热面组件吊装的一般原则是:先上后下,先两侧后中间。 Boiler heating surface components hoisting the general principle is: after the first, the first after the middle on both sides. 超高压力是指过热器出口蒸汽压力为14兆帕;亚临界压力是指过热器出口蒸汽压力为17~18兆帕;超临界压力是指过热器出口蒸汽压力为25.4兆帕;超超临界压力是指过热器出口蒸汽压力为26~27兆帕。1000MW 机组的过热器出口蒸汽压力通常为27兆帕。 Ultra-high pressure refers to the superheater outlet steam pressure of 14 million mpa; Subcritical pressure refers to the superheater outlet steam pressure of 17 ~ 18 million mpa; Supercritical pressure refers to the superheater outlet steam pressure of 25.4 million mpa; Ultra supercritical pressure refers to the superheater outlet steam pressure is 26 ~ 27 million mpa. The superheater outlet of 1000 mw steam pressure usually is 27 million mpa. 大容量、高参数、热效率高的600MW超临界、1000MW超超临界锅炉是目前国内电站机组发展的新趋势。 The large capacity and high parameters, high thermal efficiency, 600 mw ultra supercritical boiler of 600 mw supercritical, is the new tendency of the development of the power plant unit in China. 2.电站锅炉本体设备是指(过热器 )。 2. Power plant boiler equipment means (superheater). 电站锅炉系统主要设备由锅炉本体设备和锅炉辅助设备组成,其中引风机、吹灰设备和除尘设备属于锅炉辅助设备,过热器属于锅炉本体设备。 Power pla

文档评论(0)

ipuflu + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档