QA-10-P-Inspection Measuring + Test Equipment_r00.docVIP

QA-10-P-Inspection Measuring + Test Equipment_r00.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
QA-10-P-InspectionMeasuringTestEquipment_r00

Inspection Measuring Test Equipment Revision/ 版次 Date/ 日期 Author/ 作者 Reviewed/ 审阅人 Approved/ 批准人 00 01 QA-10-P-Inspection Measuring Test Equipment_r00 Purpose Scope This document describes the system used to verify the accuracy of all the instruments and equipment used for the inspection, measuring and testing of work activities. This document applies to all instruments and equipment for the Project, whether in the direct ownership of Century 3, Sub-Contractor, Independent Testing Agency or other, whereby such instruments and equipment are required to record data and results as identified within the Project Inspection Test Plan. Responsibilities The QA/QC Manager is responsible for ensuring the effective maintenance and implementation of this procedure. The Construction Manager is responsible for ensuring that the controls defined within this procedure are effectively implemented and maintained. References N/A Actions Any item of inspection, measuring or test equipment either owned by Century 3, sub-contractor or by an authorized testing laboratory or purchased for use on this project shall be accompanied by a calibration certificate that confirms the condition of the equipment and its capability to perform to a recognised National or International Standard. All personnel using measuring and test equipment other than an authorized testing laboratory shall be responsible to ensure that it is maintained in good condition and in the event of visible deterioration between routine calibration checks shall advise their manager. Each piece of equipment used on this project for inspection, measurement and test shall be identified with a unique serial number and recorded in the Measuring Equipment Register maintained by the QA/QC Manager. Calibration of equipment shall be carried out at pre-determined intervals in accordance with the requirements of the Inspection, Measuring Test Equipment and/or the national and/or international standard

文档评论(0)

sd44055 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档