integatedwelltestingandacidizingproposal(试油.DOC

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Integrated Well Testing & Acidizing Proposal For Well XXX Contents 1 Basic Information 4 1.1 Well Basic Information 4 1.2 Well Profile Schematic 5 1.3 A. Well Completion Schematic 6 1.4 Well Testing Intervals 8 1.5 Perforation Data 8 1.6 Well Logging Interpretation Results 8 1.7 Mud Logging data 10 2 Geological characteristics 11 2.1 Structure characteristics 11 2.2 Reservoir characteristics 12 2.3 Fracture Pressure Forecast 14 2.4 Well Testing Results of Adjacent Well 14 3 Well Testing Objectives 15 4 Data Acquisition Requirements 16 4.1 Surface Data Acquisition 16 4.2 Bottom Hole Pressure and Temperature 16 4.3 PVT Sampling 17 4.4 Report Preparation: 17 5 Acidizing Design 18 5.1 Stimulation Technology for Carbonate Reservoir 18 5.2 Selection of Acid Fluid 18 5.3 Pre-flush and after-flush fluid selections 19 5.4 Acid Injection Method 19 5.5. Acidizing intensity and total acid amount 19 6 Scope of Work 21 6.1 Structure of Work Sequences for each zone 21 6.2 Brief Scope of work for Acidizing and Testing 21 6.3 Detailed procedure of main test 23 6.4 Detailed Procedure for Acidizing Operation 24 6.5 Temporary Suspension Instruction 27 6.6 Equipment List 28 7 Operation preparation ,QHSE and Risks 31 7.1 Operation preparation 31 7.2 QHSE 32 7.3 Risk (Based on result from existing wells) 33 1 Basic Information 1.1 Well Basic Information Well Name Well Classification Appraisal Well Well Type/Block No Vertical Well/Block 1 Rotary Table Elevation from Ground 10.5 m Ground Level (SSL) 3.95 m Well Location Well Head Coordinates X: 190,535 Y: 3,464,925 . Structural Position: North of west flank in XXX Field TD 3055 mMD Target Formation Well Completion Method 7” Liner Perforation 3 ? “ Tubing 3 ? “ TRSSSV with 2.75” profile 3 Packer, 3 Isolated Interval Completion Fluid CaCl2 + KCl Clean Brine System 1.2 Well Profile Schematic 1.3 A. Well Completion Schematic B. Well Completion Schematic, Drilling and stratigraphic data 1

文档评论(0)

dsf80fhg0j + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档