ppt课件-p r e s e n t e d b y- united states navy(p r e s e n t e d b y -美国海军).pptVIP

  • 8
  • 0
  • 约9.6千字
  • 约 36页
  • 2017-01-22 发布于四川
  • 举报

ppt课件-p r e s e n t e d b y- united states navy(p r e s e n t e d b y -美国海军).ppt

SAFETY INSPECTIONS A separate deficiency report for each violation should be written citing standards and risk assessment code (RAC)’s WRITTEN DEFICIENCY REPORTS include I.D. # for tracking Organization Location of hazard Description of violation Standard Violated Risk Assessment Code Suggested Corrective Action Inspector’s name Date of inspection Abatement Status to include: Interim control measures Project description to include estimated cost/date of completion Corrections made to include date/cost Signature/phone of person verifying corrective action Comments for follow-up MOST FREQUENT

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档