- 1、本文档共156页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
双鱼大桥下部结构设计毕设论文
中文题目:双鱼大桥设计
副 标 题:下部结构设计
外文题目:Damage analysis and seismic retrofitting of a continuous prestressed reinforced concrete bridge
毕业设计(论文)共144页 图纸共 13 张
完成日期 2015年6月5日 答辩日期2015年6月17日
摘要,设计车速V=80Km/h。
关键词:
Abstract
The bridge is reinforced prestressed concrete simply supported T beam bridge, the first base and the lower part of the design, in overseas pavement design, bridge a total length of 280m and seven cross, 40m span, load design for highway - grade II load, design speed for V=80Km/h. This part of the design for the design of the substructure of the bridge, including bearing design, beam design, bridge pier (abutment) design, platform design, pile foundation design, the bridge department, Guangzhou City, Guangdong Province, is an important part of Guangzhou citys beltway highway, after the completion of the bridge, new traffic as possible, provide what they ought to do contribution for the economic development of Guangzhou city.
The initial design of the bridge, first access to the lot of the climate, geology, hydrology and other natural materials, and understand the local consumer and industry and trade, and then refer to the laws and regulations, calculation method, design experience and principles, on this basis, combined with the latest regulations and local data, after yourself carefully and seriously, rigorous calculated and checked out. In the design of all parameters, the shape, the size, the method are the laws and rules, with mirror, reflecting the seriousness and standard design.
The design of bearing with the laminated rubber bearings, piers of double column bored pile piers, cap with T shaped cap abutment using wall type frame buried abutment. In the calculation, the calculation and the estimated force of the horizontal force, the vertical force, the pressure of the system, the earth pressure, the earthquake force and so on are considered, and the guarantee for the a
您可能关注的文档
- 石家庄君乐宝乳业营销渠道问题探究毕设论文.doc
- 十字路口交通信号灯控时研究毕设论文.doc
- 石家庄君乐宝乳业营销渠道问题探究青岛大学 大学论文.doc
- 石油开采对乡村环境污染和破坏的对策研究论文毕设论文.doc
- 时滞项可微系统的时滞相关稳定性条件 毕设论文.doc
- 石油工程有杆抽油井工况诊断方法及程序毕设论文.doc
- 实习教师如何上好一堂体育课探析 大学论文.doc
- 实践汽车美容及养护中的打蜡-毕设论文.doc
- 食品厂电能计量方案毕设论文.doc
- 实验课程考试系统的研究与设计方案 毕设论文.doc
- 浙江衢州市卫生健康委员会衢州市直公立医院高层次紧缺人才招聘11人笔试模拟试题参考答案详解.docx
- 浙江温州泰顺县退役军人事务局招聘编外工作人员笔试备考题库及参考答案详解一套.docx
- 江苏靖江市数据局公开招聘编外工作人员笔试模拟试题及参考答案详解.docx
- 广东茂名市公安局电白分局招聘警务辅助人员40人笔试模拟试题带答案详解.docx
- 江苏盐城市大丰区住房和城乡建设局招聘劳务派遣工作人员4人笔试模拟试题带答案详解.docx
- 浙江舟山岱山县东沙镇人民政府招聘笔试模拟试题及参考答案详解1套.docx
- 最高人民检察院直属事业单位2025年度公开招聘工作人员笔试模拟试题含答案详解.docx
- 浙江金华市委宣传部、中共金华市委网信办所属事业单位选调工作人员笔试备考题库及答案详解1套.docx
- 广东深圳市党建组织员招聘40人笔试模拟试题及答案详解1套.docx
- 江苏南京水利科学研究院招聘非在编工作人员4人笔试模拟试题及参考答案详解.docx
文档评论(0)