- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水合价格市场分析
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 毕业计论文JAVA大学工资管理系统.doc
- 毕业计论文花键轴零件机械加工工艺工装设计.doc
- 毕业计雨辰贴标机械手运动控制系统设计全套图纸.doc
- 毕业文我国中小企业国际化经营存在的问题和对策研究.doc
- 毛概业调查中小企业.doc
- 毕论文酒店知识型员工流失原因及对策分析.doc
- 毕业计:基于单片机节能控制器的设计与实现何卫民.doc
- 毕论文论家族式管理向现代企业管理转变的途径.doc
- 民主中制各项制度.doc
- 民族寨设施与服务规范..doc
- 浙江衢州市卫生健康委员会衢州市直公立医院高层次紧缺人才招聘11人笔试模拟试题参考答案详解.docx
- 浙江温州泰顺县退役军人事务局招聘编外工作人员笔试备考题库及参考答案详解一套.docx
- 江苏靖江市数据局公开招聘编外工作人员笔试模拟试题及参考答案详解.docx
- 广东茂名市公安局电白分局招聘警务辅助人员40人笔试模拟试题带答案详解.docx
- 江苏盐城市大丰区住房和城乡建设局招聘劳务派遣工作人员4人笔试模拟试题带答案详解.docx
- 浙江舟山岱山县东沙镇人民政府招聘笔试模拟试题及参考答案详解1套.docx
- 最高人民检察院直属事业单位2025年度公开招聘工作人员笔试模拟试题含答案详解.docx
- 浙江金华市委宣传部、中共金华市委网信办所属事业单位选调工作人员笔试备考题库及答案详解1套.docx
- 广东深圳市党建组织员招聘40人笔试模拟试题及答案详解1套.docx
- 江苏南京水利科学研究院招聘非在编工作人员4人笔试模拟试题及参考答案详解.docx
最近下载
- SY 4201.4-2016 石油天然气建设工程施工质量验收规范 设备安装工程 第4部分:炉类.docx VIP
- 电力市场分析软件:PLEXOS二次开发_(13).电力市场改革与趋势分析.docx VIP
- 云和雪梨生产全程质量控制技术规范.docx VIP
- 电力市场分析软件:PLEXOS二次开发_(12).可视化与报告生成.docx VIP
- 2024-2025学年四川省成都市新都一中实验学校七年级(上)分班数学模拟试卷(含答案).pdf VIP
- 跨座式与悬挂式单轨运输系统幻灯片.ppt VIP
- 市场营销论文:长春农商银行小微企业贷款业务市场营销策略研究.docx VIP
- 电力市场分析软件:PLEXOS二次开发_(11).数据库管理与接口设计.docx VIP
- 电力市场分析软件:PLEXOS二次开发_(10).二次开发工具与技巧.docx VIP
- 有机肥采购项目投标书(范本).docx
文档评论(0)