- 1、本文档共54页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
汽车强支架零件的工艺分析
景德镇陶瓷学院本科生毕业设计(论文)
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 江苏建设工程项目部工会台账.doc
- 江苏播电视大学、江苏城市职业学院“十二五”规划课题指南.doc
- 江苏技大学安全题库全的哦.doc
- 江苏村信用社稽核人员任职资格考试模拟试题资料.doc
- 江苏板桥消防职业技术培训中心结业理论试题.doc
- 江苏水利专业高级工程师以及中级工程师评审要求.doc
- 江苏民专业合作经济组织发展现状研究.doc
- 江苏教师管理继续教育法律多选.doc
- 江苏工学院届毕业设计论文任务书.doc
- 江苏堤防工程技术管理办法.doc
- 城市防洪工程建设2025年社会稳定风险评估与风险预防体系研究报告.docx
- 元宇宙社交平台生态构建中的社交网络分析与应用研究.docx
- 智能制造产业孵化基地2025年产业政策环境与产业链协同创新策略研究报告.docx
- 低空经济无人机物流产业政策与产业创新驱动发展策略.docx
- 未来五年生态修复微生物技术在土壤修复领域的应用现状与挑战报告.docx
- 2025年数据要素市场交易规则与数据服务商业模式研究报告.docx
- 东华大学体育理论考试题库及答案(公共基础部分).docx
- 航空航天零部件制造领域2025年高精度加工技术深度分析报告.docx
- 2025年零售行业绿色环保产品市场分析报告.docx
- 2025年跨境电商床上用品个性化定制服务市场品牌知名度提升策略研究报告.docx
文档评论(0)