- 1、本文档共31页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
省局申报软件操作流程消费税纳税人
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 30
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 电子论文电信行业重组中的四川铁通渠道建设.doc
- 电子论文阿尔卡特软交换产品VOIP数据创建过程.doc
- 电子政务平台排版.doc
- 电机学复习提纲变压器部分.doc
- 电子采购解决方案功能介绍简.doc
- 电气专业秋检总结.doc
- 电柜引用标准.docx
- 电气自动化专业毕业论文KV变电站设计方案.doc
- 电气给水施组织设.doc
- 电子商务环境下我国农产品供应链体系的结构优化pdf.doc
- 2025年中国涤纶中长纤维行业市场调查、投资前景及策略咨询报告.docx
- 山东财经大学燕山学院《智能精准开采概率》2023-2024学年第二学期期末试卷 .pdf
- 2025年中国液化炒青机行业市场调查、投资前景及策略咨询报告.docx
- 2025至2030年中国金属纵剪生产线市场现状分析及前景预测报告.docx
- 2025年中国石墨元件行业市场调查、投资前景及策略咨询报告.docx
- 2023年黑龙江省双鸭山市友谊县兴盛乡招聘社区工作者真题及答案详解一套.docx
- 2023年黑龙江省双鸭山市友谊县兴盛乡招聘社区工作者真题及答案详解一套.docx
- TCNLIC-温室气体 产品碳足迹量化方法与要求 室内加热器及编制说明.pdf
- 带移动工作台木工锯板机精度.pdf
- 2025年中国水处理过程控制系统行业市场调查、投资前景及策略咨询报告.docx
文档评论(0)