- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
社会保险北京市社会保险政策
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 畅想百后的电力系统.doc
- 百佳信药店周庆活动方案[].doc
- 百货商场提升商务谈判的技巧增强感染力王孝民.doc
- 百家讲坛节目播出表总目录.docx
- 白文卉浅析我国电子政务的现状及发展方向.doc
- 皇台手册No组织架构.doc
- 盐酸埃罗替尼药物及相关药物目录.doc
- 监理合同成都市示范文本.doc
- 盘点:美国十个关闭门店最多的零售商.docx
- 目前LED 散热支架的趋势.docx
- 小学科学:ESP8266智能插座电路原理与动手实践研究教学研究课题报告.docx
- 《金融开放浪潮下我国多层次监管体系构建与创新研究》教学研究课题报告.docx
- 区域教育质量监测中人工智能应用的数据质量分析与优化策略教学研究课题报告.docx
- 《金融科技监管中的数据治理与合规性要求》教学研究课题报告.docx
- 《3D打印技术在航空航天领域中的多材料制造与复合材料应用》教学研究课题报告.docx
- 《绿色金融发展中的政府职能与市场机制研究》教学研究课题报告.docx
- 《植物工厂多层立体栽培光环境调控技术对植物生长发育节律的调控机制探讨》教学研究课题报告.docx
- 销售团队年度业绩总结.docx
- 银行风险管理与金融危机防范.docx
- 银行网络攻击预警与快速响应机制.docx
文档评论(0)