- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 14
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the par
您可能关注的文档
- 肌肉男训练计划在家锻炼胸肌的三个动作.doc
- 股市低迷 三招圈定只绝对小龙.doc
- 肥城百货招商服务内容.doc
- 网络营销软件网商蜘蛛操作流程.doc
- 股指期货开户的相关事宜股指期货资料.docx
- 股指期货的起源和应用.docx
- 肺病个科室建设指南.doc
- 肾细胞癌诊治指南定稿.doc
- 肿瘤免疫细胞治疗知识问答.doc
- 肿瘤防治知识讲座[].doc
- 核壳结构固态胺吸附剂合成及其CO2捕集性能优化研究 .pdf
- 2024年兴安盟公务员考试行测真题及完整答案详解.docx
- 医疗护理信息化系统优化.pptx
- 2024年兴安盟公务员考试行测真题附答案详解.docx
- 2024年兰州市公务员考试行测试卷历年真题附答案详解.docx
- 冀教版数学(2024)一年级上册3. 2.4 10加几和相应的减法 课件(共18张PPT).pptx
- 2024年凉山州公务员考试行测试卷历年真题及答案详解一套.docx
- 精品解析:2025年全国高考一卷英语真题(解析版).docx
- 2025 年最新秋季一年级上期《道德与法治》第十五课《我们不乱扔》分活动板块详细教案.docx
- 2024年凉山州公务员考试行测试卷历年真题及答案详解(夺冠).docx
文档评论(0)