- 1、本文档共40页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 中国文化论作业.doc
- 中国建筑术欣赏论文.doc
- 中国文明文化.docx
- 中国最具标实力变压器供应商强.doc
- 中国服装具竞争力品牌新闻调查.docx
- 中国本土装奢侈品品牌的机遇与挑战.doc
- 中国最具值的前十大品牌.docx
- 中国林业学研究院植保专业词汇汇总.doc
- 中国林学关于.doc
- 中国昆虫化论文.doc
- 浙江衢州市卫生健康委员会衢州市直公立医院高层次紧缺人才招聘11人笔试模拟试题参考答案详解.docx
- 浙江温州泰顺县退役军人事务局招聘编外工作人员笔试备考题库及参考答案详解一套.docx
- 江苏靖江市数据局公开招聘编外工作人员笔试模拟试题及参考答案详解.docx
- 广东茂名市公安局电白分局招聘警务辅助人员40人笔试模拟试题带答案详解.docx
- 江苏盐城市大丰区住房和城乡建设局招聘劳务派遣工作人员4人笔试模拟试题带答案详解.docx
- 浙江舟山岱山县东沙镇人民政府招聘笔试模拟试题及参考答案详解1套.docx
- 最高人民检察院直属事业单位2025年度公开招聘工作人员笔试模拟试题含答案详解.docx
- 浙江金华市委宣传部、中共金华市委网信办所属事业单位选调工作人员笔试备考题库及答案详解1套.docx
- 广东深圳市党建组织员招聘40人笔试模拟试题及答案详解1套.docx
- 江苏南京水利科学研究院招聘非在编工作人员4人笔试模拟试题及参考答案详解.docx
文档评论(0)