- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
二三线城商业地产案例解读
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 中图版高地理必修三知识归纳整理.doc
- 中图版高地理必修三.doc
- 中国银河劵贵州银河.doc
- 中外资产估准则的比较与启示.doc
- 中外货物卖合同FOB.doc
- 中国近现建筑遗产保护的理论和方法.docx
- 中央大街近美食.docx
- 中国高能行业对策.doc
- 中央电大任教师牛慧老师所给的期末复习要点.doc
- 中央及地再生资源产业相关政策.doc
- 2025至2030年中国油介活塞压力计市场现状分析及前景预测报告.docx
- 解读《GB_T 44586.1-2024体外诊断医疗器械 多重核酸分子检测 第1部分:核酸质量评价术语和通用要求》.docx
- 定向可转债在国企并购重组中的应用研究--以“海正药业”为例.pdf
- 2025年中国可充电镍氢电池行业市场调查、投资前景及策略咨询报告.docx
- 并购视角下国家集中带量采购政策对药企授权许可引进模式影响的分析--以华东医药为例.pdf
- 2025年中国埋弧焊丝镀铜生产线行业市场调查、投资前景及策略咨询报告.docx
- 2025年中国自动直缝焊、环缝焊成套设备行业市场调查、投资前景及策略咨询报告.docx
- 2025年中国空气热水器行业市场调查、投资前景及策略咨询报告.docx
- 解读《GB_T 44600.1 - 2024基于IPv4_IPv6的多媒体分发业务 第1部分:IPTV内容传输平台及终端技术要求》.docx
- 2025至2030年中国脚底按摩仪市场现状分析及前景预测报告.docx
文档评论(0)