- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
云 南 煤 矿 安 全 生 产
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 6
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 中外资产估准则的比较与启示.doc
- 中外货物卖合同FOB.doc
- 中国近现建筑遗产保护的理论和方法.docx
- 中央大街近美食.docx
- 中国高能行业对策.doc
- 中央电大任教师牛慧老师所给的期末复习要点.doc
- 中央及地再生资源产业相关政策.doc
- 中学教育专项练习.doc
- 中学生文礼仪知识竞赛.doc
- 中学生创能力培养.doc
- 多应力耦合下高压气瓶分层失效耐久性评估方法.docx
- 露营地生态旅游品牌建设与旅游目的地品牌推广研究报告.docx
- 潮玩IP授权合作2025年信用风险评价与信用体系建设报告.docx
- 2025年绿色生活新趋势:智能垃圾分类处理中心运营模式探讨.docx
- 二手潮品交易平台信用评级优化对行业健康发展的促进作用.docx
- 2025年乡村民俗文化推广平台创新服务模式探索.docx
- 2025年智能垃圾分类处理中心智能化设备智能化升级可行性分析.docx
- 2025年新能源汽车产业链绿色金融支持下的产业协同发展.docx
- 经济政策不确定性对商业银行风险承担的影响研究.docx
- 宠物殡葬行业2025年标准化运营趋势预测与分析报告.docx
最近下载
- 2025年台湾AI行销趋势报告(繁体版)-Kolr.docx VIP
- 湖北办公楼监控及电子围栏系统施工组织设计.doc VIP
- 围栏(施工组织设计围栏(施工组织设计).doc VIP
- 2024年台湾YouTube年度社群内容趋势报告(繁体版)-Kolr.pptx VIP
- 诺尔起重设备(中国)有限公司RTG&RMG中国福建招商局漳州开发区363105.pdf VIP
- 小区沥青道路设计做法.doc VIP
- 2025年台湾AI行销趋势报告(繁体版)-Kolr.pdf VIP
- 防雷安全知识试题及答案.doc VIP
- 智能体协议:MCP、A2A、ANP-智能体互联网的黎明之前.docx
- 国有企业收购合同协议.docx VIP
文档评论(0)