- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
互联网食品牌之路
决不食品安全运动组委会品牌策划部报告
——————————————————————————————————
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series bal
您可能关注的文档
- 中礼控股业计划书.doc
- 中空纤维滤膜在水处理中的应用.doc
- 中美关系利益.doc
- 中文简历作方法技巧及注意事项.doc
- 中科院深先进技术研究院简介及医药所岗位信息.doc
- 中美灾难闻报道的框架理论分析.doc
- 中粮深圳发 深圳爱联项目 服务建议书.doc
- 中秋节常月饼品牌.docx
- 中粮的未将会如何.doc
- 中文 WndowXP操作系统图文基础教程.doc
- 2025年中山市沙溪镇人民政府所属事业单位招聘11人笔试备考题库及参考答案详解一套.docx
- 2025年中山市横栏镇人民政府所属事业单位第二期招聘笔试高频难、易错点备考题库及参考答案详解一套.docx
- 2025年中山市横栏镇人民政府所属事业单位第二期招聘笔试高频难、易错点备考题库含答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库及完整答案详解1套.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库参考答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试高频难、易错点备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库附答案详解.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库及答案详解一套.docx
- 2025年中山市阜沙镇人民政府所属事业单位招聘笔试备考题库及完整答案详解1套.docx
文档评论(0)