- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
价值观目及其评价
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 34
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 交通信号业基础知识.docx
- 交易会所划书.doc
- 交换机房备带电清洗.doc
- 交强险与业三责险的比较.doc
- 交通运输本科生培养方案.doc
- 交互电子板多媒体教室方案推荐.doc
- 产业发展城市化.doc
- 交通对乡旅游发展的影响及对策.doc
- 产业园行定位与分析.doc
- 产业布局整与内需结构变迁.doc
- 合成生物学技术在生物修复领域的投资前景评估.docx
- 共享自习室空间布局优化:2025年智能化环保材料应用.docx
- 城市公园智慧导览系统2025年与绿色环保技术的结合研究.docx
- 医药冷链物流行业2025年风险管理与温度控制技术深度研究报告.docx
- 城市公园智慧导览系统2025年与智慧城市公共服务平台的互动模式研究.docx
- 2025年中国速冻食品行业市场竞争格局白皮书.docx
- 2025年跨境办公用品电商供应链绿色供应链社会责任履行报告.docx
- 2025年汽车行业新能源智能化产业布局研究报告.docx
- 城市公园智慧导览系统2025年对城市形象塑造的影响与作用分析.docx
- 城市公园智慧导览系统2025年与智慧旅游平台融合创新报告.docx
最近下载
- 2025年台湾AI行销趋势报告(繁体版)-Kolr.docx VIP
- 湖北办公楼监控及电子围栏系统施工组织设计.doc VIP
- 围栏(施工组织设计围栏(施工组织设计).doc VIP
- 2024年台湾YouTube年度社群内容趋势报告(繁体版)-Kolr.pptx VIP
- 诺尔起重设备(中国)有限公司RTG&RMG中国福建招商局漳州开发区363105.pdf VIP
- 小区沥青道路设计做法.doc VIP
- 2025年台湾AI行销趋势报告(繁体版)-Kolr.pdf VIP
- 防雷安全知识试题及答案.doc VIP
- 智能体协议:MCP、A2A、ANP-智能体互联网的黎明之前.docx
- 国有企业收购合同协议.docx VIP
文档评论(0)