- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 佳洁士闪炫白牙膏.doc
- 佳源中心场情况.doc
- 你那便利业绩提升方案案例分析.doc
- 你一招我招,汇总成省钱又省时的生活小妙招大全.doc
- 佰利联:争优势.doc
- 作文:简的智慧.doc
- 使用Viio进行数据库设计.doc
- 作物需水与灌溉用水量.doc
- 使用字号不正当竞争和商标侵权.doc
- 使用AT单证册注意事项.doc
- 2023年盘锦市公务员考试行测真题及答案详解(各地真题).docx
- 2023年武隆县公务员考试行测真题及1套完整答案详解.docx
- 2023年苏州市公务员考试行测真题及答案详解(夺冠).docx
- 2023年甘肃省公务员考试行测真题及答案详解(易错题).docx
- 2023年贵州省公务员考试行测真题(含答案详解).docx
- 2023年汕尾市公务员考试行测真题(含答案详解).docx
- 2023年毕节地区公务员考试行测真题及答案详解(易错题).docx
- 2023年淮南市公务员考试行测真题及答案详解参考.docx
- 2023年赤峰市公务员考试行测真题及答案详解(必刷).docx
- 2023年遂宁市公务员考试行测真题及答案详解(最新).docx
文档评论(0)