- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
党风廉政育学习心得体会
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 信阳光山旅游资源列表.doc
- 信息设备源共享协同服务标准的体系结构.doc
- 信谊金朱RP实施案例.doc
- 修改定稿路集装箱运输发展对策研究.doc
- 信贷相关据指标表.doc
- 修改病句习送印.doc
- 保险行业合信息化解决方案.doc
- 借鉴格式券和商业保险教案.doc
- 做一个结至上的行动派.doc
- 假洋品牌人头热销不只是冷笑话.doc
- 小学科学:ESP8266智能插座电路原理与动手实践研究教学研究课题报告.docx
- 《金融开放浪潮下我国多层次监管体系构建与创新研究》教学研究课题报告.docx
- 区域教育质量监测中人工智能应用的数据质量分析与优化策略教学研究课题报告.docx
- 《金融科技监管中的数据治理与合规性要求》教学研究课题报告.docx
- 《3D打印技术在航空航天领域中的多材料制造与复合材料应用》教学研究课题报告.docx
- 《绿色金融发展中的政府职能与市场机制研究》教学研究课题报告.docx
- 《植物工厂多层立体栽培光环境调控技术对植物生长发育节律的调控机制探讨》教学研究课题报告.docx
- 销售团队年度业绩总结.docx
- 银行风险管理与金融危机防范.docx
- 银行网络攻击预警与快速响应机制.docx
文档评论(0)