士鼎IOU管廊钢结构供货方案
Supply Scheme for IOU Pipe-rack Steel Structure
IOU管廊钢结构供货方案
The structure system of this project is truss structure and the main outline dimensions (L × H) are: 20.0*5.75 16.0*5.75, 14.0*5.7524.0*5.75, 12.0*5.75, 5.0*8.25, 16.0*8.25, 20.0*5.70 , 16.0*5.70, 24.0*5.70 , 22.0*3.75, of which the maximum dimension is 25.0*8.25 and the majority dimension is 20.0*5.75 (5.7). If these trusses are to be delivered in complete frames, there will be the following problems: 1) very difficult transportation; 2) very high transportation cost; and 3) panel parts liable to deformation and damage. For this reason, we consider layered and sectional fabrication of complete frame trusses to facilitate ex-factory by transportation, then sent to the assembling site of Yangzi Maintenance and Installation company close to construction field. This scheme both ensures plant prefabrication of all truss members and settles the truss transportation problem.
本项目结构体系为桁架(Truss),20.0*5.75 16.0*5.75, 14.0*5.7524.0*5.75, 12.0*5.75, 5.0*8.25, 16.0*8.25, 20.0*5.70 , 16.0*5.70, 24.0*5.70 , 22.0*3.75, 其中最大尺寸为25.0*8.25,尺寸为20.0*5.75的桁架数量最多。若要以整榀桁架出厂,在运输上存在以下问题:1)运输极其困难;2)运输成本高昂;3)板件易变形损坏。为此,我方考虑将整榀桁架分层分段制作,以便于运输的形式出厂,在现场附近的扬子检安公司进行组装后交货。按此方法,既保证了桁架的所有构件在工厂进行预制,也解决了桁架的运输问题。
To meet client requirements, supply scheme has been prepared for 3 different delivery statuses:
根据业主要求,将按三种不同交货状态分别制订供货方案:
Scheme A: Delivery statusDelivery of complete frames
方案A:交货状态——整榀交货
Scheme B: Delivery statusDelivery in two layers
方案B:交货状态——分二层交货
Scheme C: Delivery statusDelivery In layers and sections
方案C:交货状态——分层分段交货
Fabrication process is described in detail below.
以下将对制作过程作详细阐述。
Scheme A: Complete frame delivery (schematic)
方案A:整榀交货(图示)
1. Specific notes
具体说明
The longitudinal vertical trusses of this project shall be fabricated in layers and transported in sections. The first layer and second layer trusses shall be assembled into the maximum transportation dimensions, transported to the assembli