- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
吉大16春学期《地道工程》在线功课二(国外英文资料)
吉大16春学期《隧道工程》在线作业二(国外英文资料)
For who
Ji big 16 spring semester tunnel engineering online work 2
One, single topic (total five questions, 20 points).
The new arcane USES the bolt as the theoretical basis for the initial support.
Support is the main structure of the stress of the earth
To withstand the pressure of the perturbation
Fully exert and strengthen the self-bearing efficiency of the surrounding rock
Easy to operate fast
Correct answer:
The thickness of the concrete should be determined according to the thickness of the design and the injection site, and the initial thickness should not be less than ().
. 5
6.
8.
. 4 ~ 6
Correct answer:
The main purpose of the use of auxiliary tunnels in the tunnel construction is ().
Improve ventilation
It is convenient to organize and transport
To improve the working face, short tunneling and shorter working days
drain
Correct answer:
When it is difficult to set the wing wall under the terrain of the cave, it can be changed to ().
Column door
End wall type door
Cut bamboo doors
The terrace door
Correct answer:
Tunnel construction means building ().
Construction methods, construction techniques and construction management of tunnels and underground caverns
Underground cavern and lane
. Avoid hole
Underground traffic engineering
Correct answer:
Ji big 16 spring semester tunnel engineering online work 2
Two, multiple choice (total 15 questions, total 60 minutes.
The common anchor in the tunnel is ().
Regular cement mortar anchor
Wedge anchor bolt
Seed-pipe friction bolt
Early strong medicine pack anchor bolt
Correct answer:
When the tunnel is sprayed with concrete, the following () requirements should be met.
Before spraying, apply water or high-pressure wind to flush the dust and debris from the rock face
The section of the spray section is carried out in the descending order, not more than 6m per paragraph
The injection should be made at the appropriate thickness, and the latter layer should be followed by the previous layer
您可能关注的文档
最近下载
- 《蔚来公司盈利能力评价的案例分析》12000字.docx
- 2024年初级会计职称《初级会计实务》精讲课件-第十章--政府会计基础.pptx VIP
- Unit 6 Useful numbers PartA(3) Letters and sounds 课件 人教版(PEP)英语三年级上册.pptx
- 《Canon 5D2完全指南》.pdf
- 北京市海淀区名校2023-2024学年高二上学期生物第一次月考试卷.docx VIP
- 中医与西医临床科室的会诊、转诊制度.doc VIP
- OITEK海洋仪器6240 10A微欧计中文用户手册.pdf
- 2023-2024苏教版三年级上册《科学》全一册全部教案.doc
- 中华民族共同体概论课件专家版12第十二讲:民族危亡与中华民族意识觉醒(1840-1919).pptx VIP
- 实用新型专利申请模板.doc
文档评论(0)