吉大16春学期《地道工程》在线功课二(国外英文资料).doc

吉大16春学期《地道工程》在线功课二(国外英文资料).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
吉大16春学期《地道工程》在线功课二(国外英文资料)

吉大16春学期《隧道工程》在线作业二(国外英文资料) For who Ji big 16 spring semester tunnel engineering online work 2 One, single topic (total five questions, 20 points). The new arcane USES the bolt as the theoretical basis for the initial support. Support is the main structure of the stress of the earth To withstand the pressure of the perturbation Fully exert and strengthen the self-bearing efficiency of the surrounding rock Easy to operate fast Correct answer: The thickness of the concrete should be determined according to the thickness of the design and the injection site, and the initial thickness should not be less than (). . 5 6. 8. . 4 ~ 6 Correct answer: The main purpose of the use of auxiliary tunnels in the tunnel construction is (). Improve ventilation It is convenient to organize and transport To improve the working face, short tunneling and shorter working days drain Correct answer: When it is difficult to set the wing wall under the terrain of the cave, it can be changed to (). Column door End wall type door Cut bamboo doors The terrace door Correct answer: Tunnel construction means building (). Construction methods, construction techniques and construction management of tunnels and underground caverns Underground cavern and lane . Avoid hole Underground traffic engineering Correct answer: Ji big 16 spring semester tunnel engineering online work 2 Two, multiple choice (total 15 questions, total 60 minutes. The common anchor in the tunnel is (). Regular cement mortar anchor Wedge anchor bolt Seed-pipe friction bolt Early strong medicine pack anchor bolt Correct answer: When the tunnel is sprayed with concrete, the following () requirements should be met. Before spraying, apply water or high-pressure wind to flush the dust and debris from the rock face The section of the spray section is carried out in the descending order, not more than 6m per paragraph The injection should be made at the appropriate thickness, and the latter layer should be followed by the previous layer

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档