国家优质工程煤矿工程现场复查要点(国外英文资料).docVIP

国家优质工程煤矿工程现场复查要点(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
国家优质工程煤矿工程现场复查要点(国外英文资料)

国家优质工程煤矿工程现场复查要点(国外英文资料) The key points of the on-site review of the quality engineering coal mine in the country First, the construction of the mine project Major review content Information should be available Quality of physical appearance The specification of execution, standard Vertical shaft project (1) to inspect the section of the shaft and the vertical wall of the well wall; (2) to inspect the quality of the well wall; (3) to inspect the total flow of the wellbore; (4) to examine the test report of the materials and samples for the inspection and acceptance of concealed projects, and the quality inspection and certification of the project; (5) the quality of the shaft wellbore. (1) the wall of the well wall and the actual test. (2) the quality grade is excellent and the quality level is good. (3) the total amount of water leakage in the wellbore is not greater than 6 tons/h. (4) the record of concealed projects, the materials and test reports. (5) the installation and acceptance record of the rig is completed, the quality grade is good, and the ride in the cage feels smooth. (1) construction and acceptance of construction and acceptance of mines in the Peoples Republic of China (gbj213-90) (2) evaluation criteria for quality inspection of coal mine shaft lane in the Peoples Republic of China. (MT5009-94) Slant shaft engineering Adit engineering (1) the estuary project; (2) the work of the shaft body; (3) waterway engineering; (4) floor level and step project. (1) the record of the acceptance of the completion and the quality grade are excellent. (2) raw material test and test report. (3) the surface of the shaft, the concrete end of the tunnel and the surface of the wing wall are evenly balanced. Summer-planting place mode, no obvious fault, the silhouette is clear, line straight, the edge, the slope of attack and firm, good water and soil conservation, drainage standard, the catchment is smooth, without sedimentation. (4) the floor is flat and the ditch is

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档