- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方开挖注意事项(国外英文资料)
土方开挖注意事项(国外英文资料)
What does the earth dig for
(1) the excavation of the slope shall be determined by the use of time (temporary or permanent), the type of soil, the nature of physical mechanics, and hydrology. For permanent ground, the slope of the excavated slope should be laid down by design. For the slope of the temporary excavated slope, the slope of the temporary excavation should be determined according to the engineering geology and the slope height.
(2) the excavation of the slope of the site shall be carried out in the following order, which shall be carried out in sequence, and shall be prohibited by means of digging up the base Angle; The upper steps should be dug deeper than 30 m to prevent the cave-in, while taking the multi-step steps on the slope to excavate the machine at the same time.
(3) the excavation of the slope of the slope should be made up of a certain slope. Slope bottom with corner protector and drainage, should be dealt with as soon as possible, the steps of the reverse drainage slope, spats parapets and drain laying and dredge, to ensure the slope toe is not washed and in influencing slope stability within the scope of water, otherwise the temporary drainage measures should be taken.
, (4) the slope excavation in soft soil slope or easy to be weathered soft rock slope after excavation slope, slope toe adopt guniting, plaster, inlaying, protection of build by laying bricks or stones, and the slope drainage slope foot, avoid the influence of the slope range.
The quality of the ground level and the preventive measures:
1, site water prevention measures:
Before leveling, system design for the whole site, in line with the principle of ground first, make drainage facilities, make the whole site flow unimpeded;
The filling should be carefully layered and rolled back, with a relative density not less than 85%.
Do a good measure to check the work and avoid the calibration error.
The prevention measures of the landslide in the slope of the fill slo