- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
人工挖土方技术交底(国外英文资料)
人工挖土方技术交底(国外英文资料)
Table C1-3 technical record
The name of the project
Clarificaiton parts
Project number
The date of
Content of the disclosure:
Manual excavation of soil technology
The construction of artificial earth excavation is suitable for the construction of the foundation pit (tank) and pipe trench of general construction projects and structures.
First, preparation for construction
Technical preparation
The article collects the relevant engineering materials
(1) of the underground pipeline information Model) according to the construction project construction contract (the regulation: the construction unit shall be provided to the contractor, responsible for the data accuracy of real; The construction units shall properly protect the underground pipelines and adjacent buildings, structures (including the protection of cultural relics) and the protection of the ancient trees.
Geotechnical survey report.
The drawings and illustrations.
Technical specification
2. The machine equipment
Measuring equipment
The excavation measuring equipment is: the theodolite, the water level, the ruler, the steel tape measure.
Digged machinery
According to the scale of the project, the tools are used: spade (tip, flat head), trolley, small white line or 20 # lead wire, drilling facility etc.
Second, process flow
Manual excavation construction process, as shown.
Technical director: disclosure: make people:
Table C1-3 technical record
The name of the project
Clarificaiton parts
Project number
The date of
Content of the disclosure:
Operating requirements
According to the excavation depth, for the natural soil humidity, uniform structure, hydrogeological condition is good, and the absence of groundwater, the excavation of foundation pit can also need not put slope, to erect the excavation and supporting.
Artificial excavation
1) according to the soil condition and the site deposit and the soil conditions, the order of excavation is determined rationally, and then the excavated and ex
您可能关注的文档
- 中国七大河流(国外英文资料).doc
- 中国企业培训浅谈(国外英文资料).doc
- 中国主要岛屿面积一览(国外英文资料).doc
- 中国作文(3篇)(国外英文资料).doc
- 中国农业科技园区建设与发展(国外英文资料).doc
- 中国医科大学2012年7月考试《生理学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2013年7月考试《生理学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2013年7月考试《生药学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2014年1月考试《内科护理学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2014年1月考试《生物化学(中专起点大专)》在线作业(国外英文资料).doc
原创力文档


文档评论(0)