人工清理基槽(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
人工清理基槽(国外英文资料)

人工清理基槽(国外英文资料) Technical background record Table C2-1 Make no. 01-00 - C2-004 The name of the project Tianzhu town childrens transformation project Date of disclosure On November 21, 2013 Construction unit Beijing shunyi construction engineering company Project name Earthwork excavation Clarificaiton feed Manual clearance Content: (page 1) First, preparation for construction Main machine tools: spade, cart, small white line, steel tape, slope ruler, etc. Working conditions: 1.2.1 mechanical excavation of the earth to achieve the reserved surface. The base layer is basically flat after excavation. During the night construction, there should be adequate lighting facilities in case of the wrong digging or poaching. 1.2.4 should be carried out manually in the areas where the mechanical construction is unable to operate and the slope of the slope and the cleaning base of the slope. Second, the operation craft Process flow: Determine the order and the slope of the trough to clear the dirt, the trim and the bottom The order and grade of the soil Because of the excavation depth, two mechanical mining, excavation of the whole order will take place from west to east, so black soil with mechanical excavation sequence. 2.3 clean up the earth The configuration of 2.3.1 people: four people clean soil, two people carry dirt, two people are too flat. 2.3.2 shall not in place of clear good mechanical mining and distance piles at different position, and shall, within the scope of the soil can be shipped to dig to mechanically poached in a timely manner. But the working face of manual cleaning should not be less than 3 meters from the scope of mechanical excavation. The sides of the 2.3.3.base groove are repaired by hand, and the slope is smooth. In the process of cleaning up the soil, the position shall be measured by the step, and the axes of the axis shall be marked, so that the detail shall be excavated to the predetermined elevation. After the mechanical exit, the bottom and slo

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档