- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
人工湿地工艺流程和实验方案(国外英文资料)
人工湿地工艺流程和实验方案(国外英文资料)
A, goals,
According to the low town life sewage treatment in our province, small town economy generally is not high, the relative lack of technical management personnel, the constructed wetland technology in pingxiang south pit town to develop the technique of artificial wetland sewage processing small towns demonstration engineering research, for jiangxi province water environmental pollution problem increasingly prominent small towns to provide an effective solution.
Using artificial wetland technology to south pit river sewage treatment and artificial wetland treatment system water quality reach the town sewage treatment plant pollutant discharge standard (GB18918-2002) in the level 1 B standard.
Second, process introduction
The control process of this research is:
sewage
Bar corrupt grille
Diversion channels
Primary anaerobic biologic ponds
First class submerged wetlands
The secondary biological pond
Secondary submerged wetlands
The water
Three levels of submerged wetlands
Vertical sand filter
Main structures
(1) primary oxidation pond
Primary biological pond to the anaerobic biological pond, the front set bar grille and sand basin, through the bar corrupt grille to intercept rubbish into the wetland system of large particles and clean up.
The area is 1200m2 and has a capacity of 3500m3. The water is flooded in the form of overflow weir, which ensures a relatively calm and stable environment. The pond body is built on the elevation of the terrain, ensuring the effective water depth of 2.5 m, and the main configuration of the reservoir is the large succul lotus.
(2) subgrade diving wetlands
After dealing with the first class (anaerobic) biological pond of sewage, use of elevation difference form aeration falls, falls from hui channels, through the perforated pipe arrangement in the primary undercurrent wetland system.
The design of the first stage submerged wetland is 25m * 80m * 2.5 m (2000m2, 5000m3), the design packing depth is about 2.5
您可能关注的文档
- 中国医科大学2013年7月考试《生理学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2013年7月考试《生药学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2014年1月考试《内科护理学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2014年1月考试《生物化学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2014年1月考试《生理学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2014年1月考试《病理学(中专起点大专)》在线作业(国外英文资料).doc
- 中国医科大学2014年7月考试《药物分析》考查课试题(国外英文资料).doc
- 中国医科大学《大学英语1(中专起点大专)》在线作业 (16秋季)(国外英文资料).doc
- 中国医科大学《生物化学(中专起点大专)》在线作业 (16秋季)(国外英文资料).doc
- 中国医科大学《病理学(中专起点大专)》在线作业 (16秋季)(国外英文资料).doc
最近下载
- 2025年教科版小学三年级科学上册期末测试题(含答案解析).docx VIP
- 索尼随身听MZ-N910中文使用说明书.pdf VIP
- 2130药物治疗学-国家开放大学-2025年1月(2025秋)期末考试真题及标准答案.docx VIP
- 《数据科学统计计算》 课后习题答案汇总 chap 1--chap 6.docx VIP
- 急危重症患者绿色通道工作规范及流程.docx VIP
- 直升机维护课件.pptx VIP
- 仲裁委员会申请登记表(示例).docx VIP
- 小学一年级数学上册图画式应用题的练习.doc VIP
- 人教版一年级上册数学应用题易错专项练习题.doc VIP
- 人教版一年级数学上册应用题练习题.docx VIP
原创力文档


文档评论(0)