- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
关于工程设计变更的原则、程序、要求及实施2(国外英文资料)
关于工程设计变更的原则、程序、要求及实施2(国外英文资料)
The principles, procedures, requirements and implementation of the engineering design change
The principle of engineering design change.
Changes must be made within the framework of the initial approval;
The approval unit of the change;
(1) the unit of owner of the examination and approval unit, (2) of the project.
Change of approval authority:
(1) the principal part of the project, the main structure, the larger change 15% exceeds the probable to examination and approval for examination and approval of the original set unit and (2) the principal part of the project, the main structure and general changes by the project owner for approval.
You may propose a unit of design change:
(1) the owners unit, (2) design unit, (3) construction unit, (4) supervising agency.
Second, the process of change.
The changes made by the owner shall be carried out by the design of the technical drawing, the approval of the owner and the approval of the supervision.
Design changes: the owner approves and the construction unit is carried out after the inspection.
The changes made by the construction unit: the preliminary opinions, the approval of the design audit, the approval of the owner, the implementation of the construction party by the construction unit.
Changes made by the supervisor: approved by the design, approved by the owner, and implemented by the construction workers.
Measure the with the change drawing chart. The detailed measures for measuring and paying for the supervision shall be made by the landlord, and the payment shall be made after the owners signature.
Third, concrete implementation measures.
The construction unit puts forward report form CB34 , supervisory audit, owners approval.
Change application report 2. Construction units reported CB23 , supervision of audit agree, design review, the owner sign the recognition, has set up a file in the CB34 report approved, supervisory review put forward the measurement payment of specif
您可能关注的文档
- 企业内部客户服务与人力资源经营管理(国外英文资料).doc
- 企业应如何正确处理滞留发票(国外英文资料).doc
- 企业接受现金资产的会计处理(国外英文资料).doc
- 企业文化为何虚(国外英文资料).doc
- 企业外部公共关系建立与保护(国外英文资料).doc
- 企业标准 SW-CJ型净化工作台操作规程(国外英文资料).doc
- 企业管理实务第三章测试答案(国外英文资料).doc
- 企业家的管理兵法:战略实论(国外英文资料).doc
- 企业经营战略真题和答案(国外英文资料).doc
- 伊泰普水坝(国外英文资料).doc
- 关于慢病毒感染的相关知识总结(国外英文资料).doc
- 关于我县枯死松树清理任务展开情况的报告请示(国外英文资料).doc
- 关于我国土建结构工程耐久性的研究(国外英文资料).doc
- 关于扫地机的调研报告(国外英文资料).doc
- 关于推荐小区业主代表大会侯选人的告诉(国外英文资料).doc
- 关于文娱沙龙的计划和看法以及整合伙料(国外英文资料).doc
- 关于泰安市市政广场旅游查询拜访研究(国外英文资料).doc
- 关于活动现场秩序维护相关事宜函(国外英文资料).doc
- 关于清理各类园区用地增强地盘供应调控的紧急告诉(国外英文资料).doc
- 关于清理和操纵城市培植中离开现实的宽马路、大广场培植的告诉(国外英文资料).doc
原创力文档


文档评论(0)