- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方中的系数(国外英文资料)
土方中的系数(国外英文资料)
The coefficient on the soil
The civil part
The quota is made up of natural solid dry soil, such as the amount of artificial quota multiplied by 1.18 when wet earth is dug
The artificial quota multiplied by the coefficient of 1.43 when excavated soil with a retaining board.
Mechanical excavation engineering quantity may be calculated according to the design of the construction organization. If no rules, digging the earth quantity is less than 10000 cubic meters, according to the mechanical excavation by 90%, 10% artificial excavation calculation, digging the earth quantity in above of 10000 stere mechanical excavation by 95%, and 5% artificial excavation calculation. The artificial soil is artificially multiplied by a factor of 1.5, which can be used for mechanical failure (such as dead Angle, trimming etc.).
Artificial, mechanical times the coefficient 1.15 when the machine is wet.
When bulldozers are bulldozed or shovels shovel dirt, the average thickness is less than 300mm. The scale of the scraper is multiplied by 1.17. 6. Excavator on plate during operations, artificial, mechanical multiplied by the coefficient of 1.25, norm does not include plate laid within the required quantity, machinery consumption, actually happens in real calculation.
When bulldozer, scraper, push, shovel uncompacted ground, press the corresponding quota project times the coefficient 0.73.
When excavating the soil between the piles, the paper deduces the volume of the hole pile and the excavated pile, and calculates the amount of the earth by the corresponding excavated soil standard by 1.15.
Municipal part
The division of dry and wet soil is subject to the normal water level of the ground, and the above water level is dry soil, and the following is wet earth. When digging wet soil, the artificial quota multiplied by the coefficient 1.18, the mechanical quota multiplied by the coefficient 1.15, the amount of dry, wet soil engineering is calculated separately.