土方换填技术交底(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方换填技术交底(国外英文资料)

土方换填技术交底(国外英文资料) Schedule 8. The construction technology is in the background Construction technology is in the background Project name: The name of the project Ash library Time of disclosure Construction unit Working species LiGong Content of the disclosure: The basic earthwork is dug 1. The project summary The base of the project is high -4.1 m. Foundation pit in fill of 2.0 m, grey base the outer radius of 9.175 m, the drawing requirements gray base outside edge expansion of 1.5 m, earthwork excavation slope 1:1 to dig under the average 5.1 meters, basal soil elevation 6.1 meters, earthwork fill in to 4.1 m. 2. Construction preparation 2.1 main equipment The excavator, scraper, self-discharging car and so on. 2.2 general equipment 2.2.1 spade and steel ruler etc. 2.2 operating conditions: 2.2.1 the engineering construction in patch of filling material for soil gobi gravel soil compactness requirements of 0.97, reasonably determine the scope of the patch of filling material moisture content control, virtual parameters such as thickness and compaction times; In the case of earthmoving, the parameters shall be determined by the compaction test. 2.2.2 before filling in the ground and the completion of the completed project for inspection and the middle acceptance, then make good Hidden inspection and acceptance procedures. Before construction, the standard height mark layout should be made. Every other meter in a large pit or ditch A horizontal peg or a standard elevation point in a nearby fixed building. Horizontal piles on a large area or ground level. 2.2.4 determines the walking route of the earths machinery and vehicles, and should be examined before it is necessary 3. The operation process Technological process: The ground floor of the foundation pit is cleared up to check the soil quality, the layered pavement, the layered compaction, the inspection of the compactness and the check and acceptance Before the soil is filled, the holes on the ground or the roots

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档