土方施工技术交底记录(国外英文资料).docVIP

土方施工技术交底记录(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方施工技术交底记录(国外英文资料)

土方施工技术交底记录(国外英文资料) The land construction technology has been recorded in the ministry of quality supervision N 2002-11 Project name: the pearl of the south 5-8 floor construction unit: shaoyang city construction engineering company code: Project technical director: tao qingwu Project professional: Project professional quality inspector: yi li Team leader: Time: the date of the year The address: site Disclosure content The name of the sub-branch (subdivision) and the sub-branch project: the excavation of the basic mechanical soil The standard name and number of the basis for the execution of the foundation: the quality acceptance and acceptance specification of the foundation foundation of the building foundation, GB50202-2002 3, the disclosure content abstract: the engineering earthwork excavation adopts mechanical excavation, slope according to the construction plan and design, when it is necessary to take certain support, one-off excavation to the pile top elevation. Its soil is shipped out. 4, preparation: Main machine tools: excavator (+ teng HD700) one, bulldozer and self-discharging six. Excavation area 4.2 construction preparation: remove all sundry, prepared for the excavation of foundation pit construction scheme, complete earth grid measuring, temporary drainage measures, to complete the necessary temporary facilities, determining the path unloading soil, looking for a good unloading soil area. Construction techniques: 5.1. Mechanized excavation should be based on the engineering scale, soil conditions, underground water level, construction equipment conditions, the schedule reasonable choose earth-moving machinery, such as to give full play to the mechanical efficiency, cost savings, speed up the construction schedule. A large area of deep and small depth is excavated, and the bulldozer or loader will be used for bulldozing and loading. A large area of soil with large length and width is excavated at a time and can be used to shovel dirt with a scraper.

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档