煤炭采制样治理办法(国外英文资料).docVIP

煤炭采制样治理办法(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
煤炭采制样治理办法(国外英文资料)

煤炭采制样管理办法(国外英文资料) One purpose Range of application Reference standard The provisions of the following documents shall be the provisions of this standard through the reference of this standard. Every note date reference documents, its all subsequent modification single (not including errata content) or revised edition are not applicable to this standard, however, according to the agreement of the parties of this standard are encouraged to study whether can use the latest version of these documents. The latest version of an undated reference file applies to this standard. 3.1 reference standard The commodity coal sample adopt method GB475-1996 The preparation method of coal sample GB474-1996 Method of determination of total moisture in coal Coals industrial analysis method GB/T212-2001 The calorimetry of coal is measured in GB/t213-2003 Method GB/T214-1996 Coal ash melt determination method GB/t219-1996 4 technical terms The process of preparation and testing of a representative coal sample according to the prescribed method. Standard coal sample: high uniformity, good stability and accurate quantity of coal. Verification: the verification in this standard refers to the evaluation of the precision and accuracy of the instrument equipment by the inspection department authorized by the state. Calibration: a check of the accuracy of the instrument using standard material. Executive program 5.1 in plant coal sampling The 5.1.1 coal sample adopted the GB475-1996 commodity coal sample method. The sample crew is ready to take samples in the first 30 minutes before coal is available. 5.1.3 to the coal plant must be sampled at 3 o clock. The coal shall be sampled in the loading and unloading of the coal in the loading and unloading process. 5.1.5-car coal will be sampled by the three point cycle, and can be sampled during the unloading process. 5.1.6 in the process of sampling, if found a large number of mixed coal waste rock, sand, iron and other fake (ship), should timely r

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档