- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
如何做好地产公司的土建工程师工作?001(国外英文资料)
如何做好地产公司的土建工程师工作?001(国外英文资料)
How to be a qualified civil engineer [transfer]
I. knowledge mapping and examination
The first step in the construction technology management is to recognize the drawings, because the drawings are the basis of field construction, the drawings should fully understand the intention of the designer, and find out the problems in the drawings.
1. stages of knowledge mapping, procedures are as follows:
1) first rough and thin: first look at the plane, elevation, section, and then look at the details of the practice.
2) before: look at the sample, after the sample.
3) first building after the structure: first look at the building plans, and then look at the structure, to check the architectural drawings and structural drawings of the axis location is consistent, there is no contradiction.
4) first general, later special: first look at the general parts and requirements, and then look at the special parts and requirements.
5) drawings and descriptions of the synthesis: drawings and general instructions and detailed parts of the map should be combined to see, pay attention to drawings and instructions are inconsistent, whether the provisions are clear, the requirements are feasible.
6) civil and installation combination: first look at the construction plan, see the installation diagram, in the installation drawings, some drawings on the building have not expressed, especially for buried parts, leaving holes, the size must be checked clearly.
7) drawings and combined with the actual situation at the same time: familiar with the drawings should be considered in the construction conditions can meet the design requirements, design drawings and site is consistent with the design drawings, the same construction work, specification without contradiction.
8) on the basis of reading a diagram, keep a record while looking at it.
2. stage diagram
As far as possible may encounter problems in the construction drawings found in the stage, from the current actu
文档评论(0)