高级软件工程课件-软件测试.ppt

  1. 1、本文档共48页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高级软件工程课件-软件测试

8.4 Integration Testing Top-Down Integration Example Only A is tested by itself 8.4 Integration Testing Modified Top-Down Integration Example Each level’s components individually tested before the merger takes place 8.4 Integration Testing Bing-Bang Integration Example Requires both stubs and drivers to test the independent components 8.4 Integration Testing Sandwich Integration Example Viewed system as three layers 8.4 Integration Testing Modified Sandwich Integration Example Allows upper-level components to be tested before merging them with others 8.4 Integration Testing Comparison of Integration Strategies Bottom-up Top-down Modified top-down Bing-bang Sandwich Modified sandwich Integration Early Early Early Late Early Early Time to basic working program Late Early Early Late Early Early Component drivers needed Yes No Yes Yes Yes Yes Stubs needed No Yes Yes Yes Yes Yes Work parallelism at beginning Medium Low Medium High Medium High Ability to test particular paths Easy Hard Easy Easy Medium Easy Ability to plan and control sequence Easy Hard Hard Easy Hard hard 8.4 Integration Testing Sidebar 8.5 Builds at Microsoft The feature teams synchronize their work by building the product and finding and fixing faults on a daily basis 8.6 Test Planning Establish test objectives Design test cases Write test cases Test test cases Execute tests Evaluate test results 8.6 Test Planning Purpose of the Plan Test plan explains who does the testing why the tests are performed how tests are conducted when the tests are scheduled 8.6 Test Planning Contents of the Plan What the test objectives are How the test will be run What criteria will be used to determine when the testing is complete 8.7 Automated Testing Tools Code analysis Static analysis code analyzer structure checker data analyzer sequence checker Output from static analysis 8.7 Automated Testing Tools (continued) Dynamic analysis program monitors: watch and report program’s behavior Test execution Capture a

文档评论(0)

yaocen + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档