北航《技术经济学》在线作业二(国外英语资料).docVIP

北航《技术经济学》在线作业二(国外英语资料).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
北航《技术经济学》在线作业二(国外英语资料)

北航《技术经济学》在线作业二(国外英语资料) One, the judgment problem (total 5 questions, total 10 minutes. V ABC analysis is a primary classification. According to the object of A technical and economic index influence degree and the object number two factors, the proportion of size will all objects in the whole divided into another A, B, C three kinds of primary and secondary, its purpose is to clear the whole of the minority and most of the secondary key. B A. mistakes B. right Full marks: 2 Value analysis is a comprehensive analysis of both function and cost. B A. mistakes B. right Full marks: 2 Total investment in construction projects is the sum of fixed asset investment, fixed asset investment orientation, tax interest and liquid capital of the construction period. B A. mistakes B. right Full marks: 2 The dynamic technical economic indicators are characterized by simple and easy to calculate, which is applicable to the preliminary analysis and rough evaluation of the technical solution. a. A. mistakes B. right Full marks: 2 The investment return period index, although not considered the time value of the fund, considers the cash flow condition after the expiration of the recovery period. a. A. mistakes B. right Full marks: 2 (10 questions in total, 40 points.) V The core content of the investment project evaluation is (A). A. economic performance appraisal B. economic profit evaluation Cost evaluation Objective evaluation Full marks: 4 When the discount rate is 10%, the net present value of A project is 500 yuan, which means the internal rate of return (A) of the project. A. higher than 10% B. less than 10% C. equal to 10% It cant be defined Full marks: 4 The price of a project is 30 machines and 100 yuan per set. Building project coefficient of similar construction projects R1 = 0.8; Installation of transport and main material cost of R2 = 0.5; Other cost coefficients R3 = 0.6. Take 1.2 R4. The investment in fixed assets is (D). 12528 A. 12300 B. 12463 C. 10440 D. Full marks: 4

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档