- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
前反向链路高FER(国外英文资料)
前反向链路高FER
1, forward link high FER reason analysis
If the forward FER is too high, there is not enough forward Eb/Io. The main reasons for the forward link high FER are as follows: the forward service channel is too bad, and the pilot signal is too poor.
1) to the business channel too: if the received power and pilot Ec/Io mobile station is very high, a strong pilot means that the mobile station in the cell coverage, but the forward link of FER is very high, that may be too poor to the business channel. The main reasons are as follows: the reaction speed of forward link power control is too slow, the maximum gain of the traffic channel is too low, and the base station has terminated the pre service channel and pilot pollution.
The reaction speed of the forward link power control is too slow: the forward power control is that the base station adjusts the power allocated to each traffic channel, so that each mobile station in different propagation environment obtains sufficient signal energy. The range of adjustment is small, and the fluctuation range of nominal power is suggested to be 3~4dB. In the standard does not give its specific implementation, by the base station equipment manufacturers to design their own algorithms, so each device manufacturers may be different. The base station determines whether to increase the transmit power or reduce the transmitted power by reporting the frame error rate of the forward link by the mobile station. The mobile station report is divided into regular reports and threshold reports. These two reports can exist simultaneously, or they can be used as long as one or two of them are not needed. It is set according to the specific requirements of the operators. If the pilot signal is very strong, but the power allocated to the forward traffic channel is insufficient, the forward power control process may not keep up with the change of the channel.
The maximum gain of the service channel is too low: the maximum gain of the service
原创力文档


文档评论(0)