大棚钢架施工组织设计1(国外英语).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大棚钢架施工组织设计1(国外英语)

大棚钢架施工组织设计1(国外英语资料) The first chapter is a brief description of the project This project is the construction project of the stainless steel hall. Adopt column bottom chord point of support, the project is put four pyramid form, the total projection area 36.84 ㎡. Production and processing characteristics This project should be arranged rationally in the production process to ensure the normal operation of each process. First, the size of the bottom material of each pole must be accurate and the factors affecting size such as the amount of welding shrinkage are taken into account. Bolt ball processing is accurate, the Angle error control is within 6159. The components of bolts, seals, cones, sleeves, and tops shall be inspected according to corresponding standards and specifications to ensure the quality of the network. The design, production and construction of the frame, and acceptance must comply with the following specifications: The structure and construction of the lattice. Evaluation criteria for quality inspection of web shelf structures. Specifications of steel structure design gbj17-88; Steel grid industry standard jgj75.1-75.1-91 Steel mesh bolt ball node with high strength bolt GB/T16939; Construction load regulation gbj9-87. Chapter ii production and processing 2.1 processing range The project is a stainless steel mesh frame project, and the material is in the factory to ensure the material meets the design requirements. Article 2.1.2 material preparation is ready for the contract to be ready for payment within 5 days after the date of the contract, and then start to organize the production processing for 5 days. The frame shall be machined at the site of the installation, and the period shall be five days, ensuring the completion within the time limit stipulated in the contract. 2.2 operating procedures Materials are inspected, samples, material, cutting, spot welding, welding, inspection, finished product correction, numbering, marking, piling and trans

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档