浅谈市政排水管道工程施工质量通病的防治(国外英文).docVIP

浅谈市政排水管道工程施工质量通病的防治(国外英文).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈市政排水管道工程施工质量通病的防治(国外英文)

浅谈市政排水管道工程施工质量通病的防治(国外英文资料) Discussion on prevention and cure of common quality problems in municipal drainage pipeline project Abstract: in view of the common quality defects in the construction of pipeline drainage project, this paper briefly analyzes its causes and puts forward effective prevention measures. Key words: drainage pipeline, construction quality, common problems, prevention and control The drainage system is one of the important facilities for the normal use of other engineering facilities in the service area, so it is very important to ensure the quality of the construction. Based on the experience of construction technology work for many years, the author makes a comprehensive analysis of the common problems in the construction quality of municipal drainage pipeline project. Now the most common quality problems are divided into 4 aspects, analysis of the causes, and put forward prevention measures, Gong Tongren reference. 1 pipe position deviation or water accumulation 1.1 causes: Measurement errors, construction aliasing and unexpected avoidance of the original structure, in the plane on the location of displacement, elevation on the surface of the water, or even slope phenomenon. 2.2 preventive measures: (1) the main measures to prevent the measurement and construction are as follows: before construction, the handover monitoring and protection shall be carried out carefully according to the construction survey standards and procedures. Construction lofting shall be combined with hydrogeological conditions, according to the embedded depth and design requirements as well as the relevant regulations set out, and must be re tested to verify that the error meets the requirements before delivery. Construction shall be carried out strictly according to sample piles, and trench and foundation shall be measured and accepted on axis and longitudinal slope. (2) when a building is to be avoided during construction, the connecting well shall be added at the

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档