- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工14春《建筑施工》在线测试1~3答案(国外英文资料)
大工14春《建筑施工》在线测试1~3答案
Big work 14 spring building construction online test 1
First, radio questions (20 questions, 60 points) V 1. of the following soil materials, may be used as filling is ().
A. sludge
B. expansive soil
C. silty clay with an organic content of 10%
D. water soluble sulfate is 3% sand
The correct answer: D full marks: 3 points
2., in order to ensure the safety and effectiveness of the foundation pit construction, the distance between the recharging well point and the precipitation well point should be maintained, and the precipitation and recharge should be synchronized.
A. is greater than 6m
B. is less than 6m
C. is greater than 5m
D. is less than 5m
The correct answer: B full marks: 3 points
3. dry density after filling should be more than (above) in line with the design requirements, and the remaining () the minimum value and design value of the difference may not be greater than 0.08g/mm3, and should be dispersed, not concentrated.
A. 90%, 10%
B. 80%, 20%
C. 70%, 30%
D. 60%, 40%
The correct answer: A full marks: 3 points
The vertical deviation of 4. precast piles shall be controlled by ().
Within A. 3%
Within B. 2%
Within C. 1.5%
Within D. 1%
The correct answer: D full marks: 3 points
5. deep well points can generally reduce the water level () M.
A. 10~20
B. 20~30
C. 30~40
D. 40~50
The correct answer: C full marks: 3 points
6. feet high brick foundation generally uses a form of a smooth masonry, the top bricks on foot and a wall under the skin (moisture layer below a piece of brick) should be ().
A. progressive brick
B. one by one
C. plum flower
D. Ding brick
The correct answer: D full marks: 3 points
7. the following statement about the excavation of the foundation pit is wrong.
A. foundation pit corners can be manually combined with clear slope
B. period of construction, the construction of large machinery pit should be paved for steel plate or the base box pad road paving
C. mechanical excavation shall be shallow and deep
D. for some small, de
您可能关注的文档
最近下载
- 2024年健身与运动文化的普及与推广.pptx VIP
- 湖南省长沙市师大附中集团联考2025-2026学年八年级上学期11月期中语文试题(含答案).pdf VIP
- 山西省高级工程师答辩题库及答案(土建部分).pdf VIP
- 体育健身2024年的运动健康与全民体育普及.pptx VIP
- 中国专利奖申报书.PDF VIP
- 高三半期家长会课件.pptx VIP
- 2025年公用设备工程师之专业知识(暖通空调专业)提升训练试卷及答案.docx VIP
- 2025年航空发动机维修技术维修成本控制与维修数据管理研究报告.docx VIP
- 中华诗词之美课后答案(叶嘉莹).pdf VIP
- 2025入团考试100题考试题库(含答案).docx
原创力文档


文档评论(0)