- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电除尘(国外英文资料)
电除尘
Code for operation of electrostatic precipitator
First, the working principle of dust collector
YSC series of electric dust collecting mechanism of flue gas dust is by electric field and electron positron collisions between electrodes and charged, effect of charged particle in the electric field under the anisotropic electrode movement and adsorbed on the specific electrode, through vibration, and makes the dust particles from the electrode into ash hopper, the ash conveying system away. In order to achieve the purpose of dedusting, this equipment adopts high voltage negative corona electrode mechanism.
Two. The start-up and operation of electrostatic precipitator
1. boiler ignition before 12 - 24 hours, into the high voltage insulator chamber, the top beam and the corona electrode porcelain axle and so on heating device and a temperature detecting device, observation of heating should be normal, controlling the heating temperature is higher than the dew point of the flue gas temperature of 20-30 DEG C
2. boiler ignition before 12 - 24 hours, into the hopper heating device system.
3., 2 hours before the ignition of the boiler, start the corona (cathode) dust collector (anode) vibration device, to confirm the correct direction of rotation, good working conditions, vibration way to use continuous vibration.
4., 2 hours before the ignition of the boiler, start the ash discharge motor and in a low speed state, the ash motor to confirm the correct direction.
5, with the ignition of boiler unit, to observe in low smoke temperature under the condition of lower ash hopper and level indicator, to remove ash and ash removal system and the normal is not blocked.
6, check the hole, door, flange, joint surface and other tight conditions, and found that the timely elimination of air leakage.
7. boiler combustion stability at the end of the ignition, boiler load reached 70% of the rated load, or smoke exhaust temperature (for common coal species) reached 110 degrees, respectiv
您可能关注的文档
- 宠物全科门诊处方集(国外英文资料).doc
- 寒潮2(国外英文资料).doc
- 宫颈癌患者护理知识(国外英文资料).doc
- 宫门带(国外英文资料).doc
- 对华产品反倾销透视(国外英文资料).doc
- 对工业文明的批判:精神分析与法兰克福学派(国外英文资料).doc
- 对文化相对主义的反思(国外英文资料).doc
- 导管架平台(国外英文资料).doc
- 导线的安全电流(国外英文资料).doc
- 导线载流量计算(国外英文资料).doc
- 人教版数学九年级上册《 二次函数》说课稿(共19张PPT).ppt
- 人教版八年级上册 12.2.2三角形全等的判定 “边角边”判定三角形全等 (共22张PPT).ppt
- 人教版初中数学2011课标版八年级上册第十二章12.2 三角形全等的判定 课件(共16张PPT).ppt
- 人教版九年级第十单元课题1浓硫酸1 (共18张PPT).ppt
- 人教版初中数学七年级上册 1.4 有理数的乘除法(共22张PPT).ppt
- 人教版八年级物理上册第1章 第2节运动的描述习题课件(共20张PPT).ppt
- 人教版九年级课题2酸和碱之间会发生什么反应(共21张PPT).ppt
- 人教版初中物理2011课标版 九年级 第十八章 电功率第三节 测量小灯泡的电功率(共25张PPT).pptx
- 人教版初中数学2011课标版九年级上册第二十四章24.1圆的有关性质(共17张PPT).ppt
- 人教版初中数学2011课标版九年级上册21.2解一元二次方程(共22张PPT).pptx
最近下载
- 脑卒中管理规范 2.07急性出血性脑卒中急诊治疗流程.pdf VIP
- 《水的组成》PPT课件50.pptx VIP
- 2025浙江余姚农商行秋季校园招聘笔试历年典型考题及考点剖析附带答案详解.docx
- T_CWAN 0131-2025 焊缝疲劳分析 等效结构应力法.docx VIP
- The ARLCNI 2035 Scenarios:AI-Influenced Futures in the Research Environmen英文调查报告.docx VIP
- 招标代理服务承诺.docx VIP
- 道路拆除工程安全管理措施.docx VIP
- 断指再植术后护理.ppt VIP
- 火法冶炼与湿法冶炼的比较.pptx VIP
- 印刷油墨管理规范.pdf VIP
原创力文档


文档评论(0)