- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
远洋大厦建筑给水排水和消防设计
【设计总说明】 本建筑主楼建筑高度为97.4米,共25层,地上23层,地下2层。总建筑面积14880m2,一层为4.7米,二、三层为4.3米,四层3.9米,五~; 给水系统; 热水系统; 消火栓系统; 喷淋系统
Shanghai Baifan Water Wastewater
and Fire Design
Water Wastewater Engineering Bo Liu
Teacher Yongji Zhang, Naiyun Gao
【General Specification】 The 23-floor building, underground 2layer, the height of the building 97.4. Total area of building 14880 m2, and the height : 2-3-4.3m,5-23-3.8m, 4.7m for one,3.9m for four, substrata of 4 m.
Water supplies by the municipal water supply pipe network, the use of direct municipal water and two water pumps method of combining. To avoid directly pumping water from the municipal administration pipe network, the system installed in the basement regulating pond. From living adjustment to the pump from the pond pumped to the roof tanks, roofs installed 10 tons of stainless steel tanks. Low region,1F to 3F, gets water from the municipal water supply pipe network directly; 4F to 23F gets water from the roof tank water. Divided into high region which is from the 11th floor to 23th floor and the middle region is from the 4th floor to the 10th floor. A pressure-relief valve is placed between the 12th floor and the 13th floor to guaranteed security zone pressure. Water mains installed into two float valves, one with a prepared, in accordance with changes in water level within the tank pumps control of the rising sun. Also be equipped with water tanks overflow pipe, above the maximum height of the water level from 20 to 30 mm, the way to roof.
Use of sewage and waste diversion drainage system, sewage discharged into septic tanks entered the municipal drainage, wastewater directly into municipal sewage pipe network. Bathroom, the slope of the ground to set the direction of the end missed. Wang drainage pipe diameters less than De110 the sweeping mouth of the same diameter and the diameter; Wang drainage tube diameter De110 and above, sweeping from De110 diameter. Sewage and waste Standpipe shared a special ventilator. I
文档评论(0)