砂石系统调试及试运行作业指导书(Instruction for commissioning and operation of sand and gravel system).docVIP

砂石系统调试及试运行作业指导书(Instruction for commissioning and operation of sand and gravel system).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砂石系统调试及试运行作业指导书(Instruction for commissioning and operation of sand and gravel system)

砂石系统调试及试运行作业指导书(Instruction for commissioning and operation of sand and gravel system) Instruction for commissioning and operation of sand and gravel system This article is contributed by yhz963 Quality system documentation Instruction for commissioning and operation of sand and gravel system Document number: Number: the number: control requirements: Compile: check: To examine: Approval: Date of issue: date of release: 1 check the equipment before commissioning and 1.1. Check whether the components of the equipment are properly assembled, and whether all the connecting bolts are pressed as required Is the welding site firm and reliable?. 1.2 check all lubrication areas of the equipment, the amount of lubricating oil and brand must comply with equipment technology Documentation requirements. 1.3 inspect the drive or drive belt, the installation of couplings or pulleys, and the tension of the belt Shall comply with the requirements of the equipment installation instructions. 1.4 hydraulic lubrication system equipment, must check the hydraulic lubrication system all the pipeline connection, the connection of the pipeline should be correct, oil level and oil pressure should meet the requirements, hydraulic system without oil leakage. 1.5 check the insulation of the motor and electrical equipment, motor insulation should meet the requirements, the cabinet wiring It should be correct. 1.6 remove sundries around the equipment and keep the site clean and tidy. No foreign objects are allowed in the equipment. 2 single machine debugging 2.1 electrical and operation control system adjustment test 2.1.1 check according to electrical principle diagram and installation wiring diagram, internal wiring and external wiring must be correct. 2.1.2 according to the type of power supply, classification and capacity to check, debug its cut-off capacity, fuse capacity, overvoltage, undervoltage, over-current protection, etc., inspection or debugging content must comply with its specified

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档