建筑计算员经验数据(Architectural analyst experience data).docVIP

建筑计算员经验数据(Architectural analyst experience data).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑计算员经验数据(Architectural analyst experience data)

建筑计算员经验数据(Architectural analyst experience data) I. The amount of concrete used in ordinary residential buildings and the amount of steel used: 1, multi-storey masonry residential: reinforced concrete 30KG/m2 0.3 - 0.33m3/m2 2, multi-storey frame: reinforced 38 - 42KG/m2 concrete 0.33 - 0.35m3/m2 3, small high-level 11 - 12 layers: steel 50 - 52KG/m2 concrete 0.35m3/m2 4, high-rise 17 - 18: Steel 54 - 60KG/m2 concrete 0.36m3/m2 5, high layer 30 H=94 meters: Steel 65 - 75KG/m2 concrete 0.42 - 0.47m3/m2 6, high-rise hotel style apartment 28 H=90 meters, 65 - 70KG/m2 steel Concrete 0.38 - 0.42m3/m2 7, villa concrete dosage and steel volume between multi-storey masonry residential and high-rise 11 - 12 layers between The above data are designed according to the seismic 7 degree zone rule Two, ordinary multi-storey residential building construction budget economic indicators 1, outdoor doors and windows (excluding units, doors, security doors) area of 0.20 - 0.24 of the building area 2, the template area accounts for about 2.2 of the floor area 3, the outdoor plastering area accounts for about 0.4 of the floor area 4, indoor plastering area accounted for 3.8 of the floor area Three, construction efficiency 1, a plastering worker, a day plastering 35 square meters in 2, a brick work day, brick red 1000 - 1800 pieces 3, a brick work a day, build hollow brick 800 - 1000 pieces, 4, ceramic tile 15 square metre 5, scraping the first 300 square meters / day, second times 180 square meters / day, third times the pressure of 90 square meters / day Four. Basic data 1, 2500KG/m3 2, reinforced concrete weight per meter of weight 0.00617*d*d 3, dry sand weight 1500KG/m3, wet sand weight 1700KG/m3 4, stone weight 2200KG/m3 5, one cubic meter of red brick about 525 pieces (wall thickness) 6, a cubic metre of hollow brick about 7, 175, sieve a side clean sand, 1.3 square ordinary sand Very useful, but data only for reference, different design data difference is larger 1, folding gray m

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档