- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
结构人员在设计中的注意事项-PKPM(Notes on the design of structural personnel -PKPM)
结构人员在设计中的注意事项-PKPM(Notes on the design of structural personnel -PKPM)
Here is a note to each structure in the design of our hospital chief engineer, now made up for your reference!!!
2000 series of new specifications early implementation of structural design considerations
According to the Ministry of construction requirements, from January 1, 2003 onwards, the full implementation of the new norms, the corresponding 89 series of norms abolished. In order to correctly understand and effectively implement the relevant 2000 series of specifications, the following key points are raised, and the structural designers should pay attention to them:
I. General Provisions
1, the design instructions should indicate the engineering design life, safety level, selection of building materials, should be marked specifications, models, performance and other technical indicators, the quality must meet the requirements of the national standards.
2 and 2003 signed the contract design projects, will be used in accordance with the new specifications of the software for calculation and analysis, TBSA with 6 edition, SATWE with 2003.1 and later version.
3, with the new version of software calculation results, steel will be improved, our institute provides a new version of software to calculate the beam, column main reinforcement, steel priority HRB400. Primary column stirrups shall be preferentially adopted by HRB400.
4, wind load value, Nanjing region design cycle 50 years, W0 = 0.40Kpa, design cycle 100 years, W0 = 0.45, wind sensitive buildings, and more than 60 meters tall building according to W0 = 0.45 value.
5, basic snow pressure, 50 years in Nanjing area, the design cycle of 0.65Kpa, the design period of 100 years from 0.75Kpa.
6, the definition of small towers should be careful when the height of the tower to the building proper height effect, small tower should be reported to determine the structure of Institute of Specialized Committee.
7, construction plans involving steel tru
您可能关注的文档
- 直线和圆的位置关系(The positional relation between a line and a circle).doc
- 直线的倾斜角和斜率(The slope angle and slope of a straight line).doc
- 直入人心的八大说话技巧(Eight straight into the heart.).doc
- 直线的斜率教学设计(Slope teaching design of straight line).doc
- 直线的点斜式方程教案(Point oblique equations of straight lines).doc
- 相声中贯口表演及方法(In the hole comic performances and methods).doc
- 直觉思维(Intuitive thinking).doc
- 相对论有没有用(Is there any use of relativity).doc
- 相应语法专题句子翻译训练(Corresponding grammar topic sentence translation training).doc
- 相机如何选购(How do I buy the camera).doc
- 结构抗震设计说明(Structural seismic design specification).doc
- 结构成本(Structure cost).doc
- 经验交流司法考试辅导用书三大本行政法的13个硬伤(Exchange of experience 13 flawed judicial examination counseling books big three of the administrative law).doc
- 结构施工图的识图_飘渺的火柴的空间_百度空间(Construction drawing map _ ethereal match space _ Baidu space).doc
- 结果导向的时间管理方法(Result oriented time management method).doc
- 结伴东莞寻欢,丧命哥们儿之手!(With Dongguan tiles, killed buddy hand!).doc
- 结蹄组织(Hoof knot).doc
- 结核抗体的3种检测方法(3 methods for the detection of antibody against tuberculosis).doc
- 经纬仪的检验与校正的步骤(Inspection and correction of theodolite).doc
- 绘图经验(Drawing experience).doc
原创力文档


文档评论(0)